Garfield Street SW Reconstruction & Dillon Street SE Paving Extension Project

Bid Number: ST-003-2018

The project consists of the full removal and reconstruction of approximately 4,000 sq. yds. of Garfield Street SW between 1st Ave W and 5th Ave SW of , including curb & gutter, sidewalk and driveway restoration, approximately 1,100 lf 8? water main, approximately 400 linear feet horizontal directionally drilled (HDD) 8? water main, water services, approximately 650 linear feet 8? sanitary sewer main replacement, sanitary manhole replacement, sanitary services , temporary erosion control and turf restoration.

The project also consists of the construction of approximately 855 sq. yds. of Dillon Street SE roadway extension between 2nd Ave SE and 3rd Ave SE including curb and gutter, concrete storm intakes, concrete storm drains, temporary erosion control, and turf restoration.

Each project will include a roadway that is 31 ft. wide with alternative bids for Portland cement concrete or Hot Mix Asphalt

Status: Open

Close Date: 04/19/2018 1:30 PM

Attached File: ST-003-2018.pdf